Quick Summary
Limit orders are best for most trades—you set the price and pay lower fees. Market orders are for when speed matters more than price. Stop-loss orders protect against big drops. Advanced orders like OCO combine multiple strategies.
Order Types Overview
| Order Type | Execution | Price Control | Best For |
|---|---|---|---|
| Market | Instant | ❌ None | Speed priority |
| Limit | When price hits target | ✅ Full | Most trades |
| Stop-Loss | When price drops to trigger | ⚠️ Partial | Downside protection |
| Stop-Limit | Limit order after trigger | ✅ Full | Controlled exits |
| OCO | One cancels other | ✅ Full | Take-profit + stop-loss |
Order Types Explained
Market Order
A market order executes immediately at the best available price. You're saying "buy/sell now at whatever price is available."
Example: BTC is at $85,000. You place a market buy for $1,000. Your order fills instantly at ~$85,000 (plus any slippage).
Guaranteed execution, instant
Higher fees (taker), slippage risk
Limit Order
A limit order only executes at your specified price or better. You're saying "only buy if price drops to X" or "only sell if price rises to Y."
Example: BTC is at $85,000. You place a limit buy at $83,000. Your order waits until BTC drops to $83,000, then fills. If BTC never drops that low, your order never executes.
Price control, lower fees (maker)
May not execute, requires patience
Stop-Loss Order
A stop-loss triggers a market sell when price falls to your stop price. It's insurance against big drops—"if BTC falls below X, sell everything."
Example: You bought BTC at $85,000. You set a stop-loss at $80,000. If BTC drops to $80,000, a market sell triggers automatically, limiting your loss to ~$5,000.
Automatic loss protection, peace of mind
Slippage in fast markets, can trigger on wicks
Stop-Limit Order
Combines stop trigger with limit execution. When stop price is hit, a limit order is placed instead of a market order. More control, but might not fill in crashes.
Example: Stop price: $80,000. Limit price: $79,500. When BTC hits $80,000, a limit sell at $79,500 is created. You avoid selling below $79,500, but if price crashes through both levels, your order might not fill.
Price floor guaranteed
May not execute in flash crashes
OCO (One-Cancels-Other)
Two orders linked together—when one executes, the other automatically cancels. Perfect for setting both take-profit and stop-loss simultaneously.
Example: You bought BTC at $85,000. You create an OCO with: (1) Limit sell at $95,000 (take profit), and (2) Stop-loss at $80,000 (cut losses). Whichever triggers first executes, and the other cancels.
Complete trade management, set and forget
Not available on all exchanges
Order Type Availability by Exchange
| Exchange | Market | Limit | Stop | Stop-Limit | OCO |
|---|---|---|---|---|---|
| Kraken | ✓ | ✓ | ✓ | ✓ | ✓ |
| Coinbase Advanced | ✓ | ✓ | ✓ | ✓ | ✗ |
| Gemini | ✓ | ✓ | ✓ | ✓ | ✗ |
| Binance.US | ✓ | ✓ | ✓ | ✓ | ✓ |
| Crypto.com | ✓ | ✓ | ✓ | ✓ | ✓ |
When to Use Each Order Type
Fast-moving markets, news-driven trades, when you need to exit NOW regardless of price
Regular buys/sells, targeting specific price levels, reducing fees with maker orders
Protecting profits, limiting downside, managing risk while away from screens
Complete trade plans—profit target + stop loss in one setup
Frequently Asked Questions
What's the difference between maker and taker fees? +
Can stop-losses trigger on false dips? +
Should beginners use market or limit orders? +
Do limit orders expire? +
The Bottom Line
Limit orders should be your default—better prices and lower fees. Use market orders only when speed is critical. Set stop-losses to protect against major drawdowns. Kraken and Binance.US have the most advanced order types including OCO for complete trade management.
Compare All Exchanges